Provided by Tiger Trade Technology Pte. Ltd.

Lotus Resources

0.215
0.000
Volume:4.76M
Turnover:1.04M
Market Cap:117.56M
PE:-0.63
High:0.220
Open:0.215
Low:0.215
Close:0.215
52wk High:3.200
52wk Low:0.205
Shares:546.78M
Float Shares:421.01M
Volume Ratio:0.90
T/O Rate:1.13%
Dividend:- -
Dividend Rate:- -
EPS(TTM):-0.342
EPS(LYR):-0.342
ROE:-40.59%
ROA:-20.08%
PB:0.42
PE(LYR):-0.63

Loading ...

Assessing Lotus Resources (ASX:LOT) Valuation Ahead Of The Q3 2026 Earnings Call

Simply Wall St.
·
May 01

Lotus Resources Confirms Continuity of Mineralization at Botswana Project; Shares Down 3%

MT Newswires Live
·
Apr 29

BRIEF-Lotus Resources Says Kayelekera Production Resumes

Reuters
·
Apr 17

Lotus Resources resumes Kayelekera uranium processing after fire damages control panels

Reuters
·
Apr 17

Lotus Resources Ltd - on Track for Steady-State Production at Kayelekera in Q2 Cy2026

THOMSON REUTERS
·
Apr 17

Lotus Resources Ltd - Kayelekera Operations Resumed After Fire Damage Repaired With Interim Panels

THOMSON REUTERS
·
Apr 17

Sprott lifts Lotus Resources stake to 12.4% from 10.1%`

Reuters
·
Apr 13

Stock Track | Lotus Resources Plummets 5.12% Intraday on Shrinking Revenue Report

Stock Track
·
Apr 13

Can Lotus Technology (LOT) Turn Shrinking Revenue And New Hyper SUV Ambitions Into Strategic Strength?

Simply Wall St.
·
Apr 13

Earnings Flash (LOT) Lotus Technology Posts Q4 Loss $0.14 per Share

MT Newswires Live
·
Apr 10

A Look At Lotus Resources (ASX:LOT) Valuation After The Kayelekera Fire And Production Downtime

Simply Wall St.
·
Apr 10

Stock Track | Lotus Resources Plummets 5.05% Intraday Following Fire-Related Production Halt at Kayelekera Mine

Stock Track
·
Apr 09

Lotus Resources expects three-week Kayelekera downtime after fire damages control panels

Reuters
·
Apr 08

BRIEF-Lotus Resources Updates on Kayelekera Production

Reuters
·
Apr 07

Stock Track | Lotus Resources Plummets 5.51% Intraday on Fire Incident and 3-Week Production Downtime at Kayelekera Uranium Mine

Stock Track
·
Apr 07

Lotus Resources - Will Replace 2 Electrical Control Panels in Drying & Packaging Area of Kayelekera Uranium Mine Due to Fire Damage on 4 April

THOMSON REUTERS
·
Apr 07

Lotus Resources - Incident Is Expected to Result in Production Downtime of Approximately 3 Weeks for Repairs at Kayelekera Uranium

THOMSON REUTERS
·
Apr 07

Lotus Resources Ltd - Kayelekera Production Update

THOMSON REUTERS
·
Apr 07

Lotus Resources - Damage Limited to Two Electrical Panels, No Personnel Were Impacted

THOMSON REUTERS
·
Apr 07